For over 30 years, BTU has developed diverse engineering and construction projects. Below you will find the details:

#179 – 5,2MM m3/day Expansion

Brief description: Detailed engineering, equipment and material supply, building, mounting and start up of high pressure gas pipe (Gasoducto Norte) Expansion 5,2MM m3/day, operated by TGN S.A. Total expansion 4 stages: 101,5 km gas pipe 30″ and 24″.

See project

#178 – Separation and dehydration plant – Aguada del Chañar

Brief description: Detailed engineering, equipment and material supply, building, mounting and start up of natural gas separation and dehydration plant and five flow-lines, located in Aguada del Chañar, 60km from Añelo, Neuquén. The project included the equipment needed for the described processes, recovery of gas for use in power generators, storage of separated liquids and…

See project

#176 – 3.2MM m3 /day expansion

Brief description: Detailed engineering, material and equipment supply, building, assembly and commissioning in Córdoba for Gasoducto Norte, operated by TGN S.A . Total length 4 sections, 87.3km, 30″ and 24″ diameter.