Below you will find more information about the projects being developed nowadays by BTU:
Brief Description: General Belgrano Railroad, Branch C3 Recovery and improvement project Section 1: Pr. 782,023 to Pr. 812,773 Section 2: Pr. 812,773 to Pr. 844,273 Section 5: Pr. 907,273 to Pr. 938,642
See project
Brief description: Basic and detailed engineering revision, supply, manufacturing, building and assembly, commissioning and assistance for Pichanal Turbo Compressor Plant – 4th Turbo Compressor start up, located in Salta.
See project
Brief description: Detail engineering, material & equipment supply, building, assembly and start up of high pressure gas pipe (Gasoducto del Noreste Argentino). Aimed to town approach, this project will be carried out by UTE jointly with Esuco S.A and Victor Contreras S.A, being BTU the Technical Director.
See project
Brief description: Full renovation of Ferrocarril Sarmiento railroad structure from km51,2 Gral. Rodríguez to km 66,8 Luján, Buenos Aires. Carried out jointly with the full renovation of 5 stations, 17 rail track equipments and 1,5 km of auxiliary railroads.
See project