Proyecto #179
5,2MM m3/day Expansion
Detailed engineering, equipment and material supply, building, mounting and start up of high pressure gas pipe (Gasoducto Norte) Expansion 5,2MM m3/day, operated by TGN S.A. Total expansion 4 stages: 101,5 km gas pipe 30″ and 24″.
Finalizado
  • Contractual Name N11a from Recreo, Córdoba, to Dean Funes, Córdoba.

  • 27 km high pressure gas pipe.

  • 30″ diameter

Main characteristics – Section 78

  • Contractual Name N11a from Recreo, Córdoba, to Dean Funes, Córdoba.

  • 27 km high pressure gas pipe.

  • 30″ diameter

Main characteristics – Section 42ab

  • Contractual Name N05ab from Miraflores, Salta, to Lumbreras, Salta.

  • 14km high pressure gas pipe.

  • 24″ diameter

Main characteristics – Section 46

  • Contractual Name N09a from Tucuman, Stgo Del Estero to Lavalle, Stgo. Del Estero.

  • 11,2km high pressure gas pipe

  • 24″ diameter

Main characteristics – Section 83a

  • Contractual Name N13d from Ferreyra, Salta to Tio Pujio, Salta.

  • 33,5 km high pressure gas pipe

  • 30″ diameter

Main characteristics – Section 86

  • Contractual Name N33 from San Jerónimo, Salta to Pacheco, Salta

  • 15,8 high pressure gas pipe

  • 30″ diameter