Proyecto #094
Barrios Suarez y Ferrer – Natural gas supply
Detailed engineering, supply, building, assembly and start up of the natural gas provision to Suárez and Ferrer neighbourhoods, in Cordoba city, Córdoba
Finalizado
  • The distribution network was built with steel pipes (approx 16,000 mts long)