Proyecto #107
Camilo Aldao – Reduction station and interconnection gas pipe.
Detailed engineering, supply, building, assembly and start up of Reduction station and interconnection gas pipe in Camilo Aldao, Córdoba, according to specifications stated by Gas del Estado S.E
Finalizado
  • Pressure reduction from 60 to 15 bar and from 15 to 1.5bar.

  • Interconnection Gas pipe – 4,000 mts long

Main site characteristics

  • Pressure reduction from 60 to 15 bar and from 15 to 1.5bar.

  • Interconnection Gas pipe – 4,000 mts long