Proyecto #140
Chimen Aike / Río Gallegos connection – High Pressure gas pipe and supplementary works.
Provision as turnkey system.
Finalizado
  • Provision as turnkey system.

  • Gas Pipe:

    Length: 20.000 mts

    Diameters: 6″ and 8″

  • Rio Chico crossings, routes and railroads.

  • Cathodic protection through print current system.