Proyecto #073
Plata Dock Sud – Cooler tanks – Full soil levelling
Basic and detailed engineering, supply, building and performance of every task concerning the full levelling of the land containing the site, the slopes and the crowning of protection ditching of cooler tanks – 2nd Stage – Dock Sud
Finalizado