Brief description:

Detailed engineering, material and equipment supply, building, assembly and commissioning in Córdoba for Gasoducto Norte, operated by TGN S.A
. Total length 4 sections, 87.3km, 30″ and 24″ diameter.

Main characteristics – Section 78a

  • Contractual Name N11a from Recreo, Córdoba, to Dean Funes, Córdoba.

  • 13km high pressure gas pipe.

  • 30″ diameter

Main characteristics – Section 77

  • Contractual Name N10a from Lavalle, Córdoba, to Dean Funes, Córdoba.

  • 36.8 high pressure gas pipe

  • 30″ diameter

Main characteristics – Section 83

  • Contractual Name N13b from Ferreyra, Córdoba, to Tio Pujio, Córdoba

  • 16.3km high pressure gas pipe

  • 30″ diameter

Main characteristics – Section 42

  • Contractual Name N05 from Miraflores, Salta, to Lumbreras, Salta.

  • 21.2km high pressure gas pipe

  • 24″ diameter