Detailed engineering, material and equipment supply, building, assembly and commissioning in Córdoba for Gasoducto Norte, operated by TGN S.A
. Total length 4 sections, 87.3km, 30″ and 24″ diameter.
Main characteristics – Section 78a
Contractual Name N11a from Recreo, Córdoba, to Dean Funes, Córdoba.
13km high pressure gas pipe.
30″ diameter
Main characteristics – Section 77
Contractual Name N10a from Lavalle, Córdoba, to Dean Funes, Córdoba.
36.8 high pressure gas pipe
30″ diameter
Main characteristics – Section 83
Contractual Name N13b from Ferreyra, Córdoba, to Tio Pujio, Córdoba
16.3km high pressure gas pipe
30″ diameter
Main characteristics – Section 42
Contractual Name N05 from Miraflores, Salta, to Lumbreras, Salta.
21.2km high pressure gas pipe
24″ diameter