Brief Description:

    General Belgrano Railroad, Branch C3 Recovery and improvement project

  • Section 1: Pr. 782,023 to Pr. 812,773
  • Section 2: Pr. 812,773 to Pr. 844,273
  • Section 5: Pr. 907,273 to Pr. 938,642
  • Narrow gauge (1000 m)

  • 278.000tn ballast

  • 190.000m rails

  • 10.425 Thermal aluminium welding / butt weld

  • 145.000 pressed concrete sleepers

Main site characteristics

Deadline: 365 days
A total of 90 km of simple railway, to be developed in 3 different stages, two of them adjoining.
8 stations.
14 assembled rail track equipments
4km auxiliary railroad
42 artwork pieces (artwork piece: any structure used to cross obstacles)
62 level crossings (monolithic flagstone)