#159 – El Calafate – Horizontal LPG tanks re testing and re habilitation.
Brief description: Labor and material supply for re testing and re habilitation of 170 m3 capacity fixed horizontal LPG tanks, separator tanks in El Calafate, Santa Cruz.
For over 30 years, BTU has developed diverse engineering and construction projects. Below you will find the details:
Brief description: Labor and material supply for re testing and re habilitation of 170 m3 capacity fixed horizontal LPG tanks, separator tanks in El Calafate, Santa Cruz.
Brief description: Labor and material supply for the expansion of propane gas storage plant, El Calafate, Santa Cruz.
Brief description: Labor and material supply for re testing and re habilitation of 170 m3 capacity fixed horizontal LPG tanks, separator tank, decanter tank, buffer tank and steamer – Río Turbio and 28 de Noviembre – Santa Cruz.
Brief description: Engineering, material and labor supply, building and assembly for gas network and internal home consumption facilities renovation – Barrio Gregores, Caleta Olivia, Santa Cruz.
Brief description: Engineering, material and labor supply, building and assembly of an 100 m3 LPG storage plant and its distribution network in Los Antiguos, Santa Cruz.
Brief description: Engineering, material, equipment and labor supply for the start up of a Regulation / Odorization plant and distribution network and home services in Cañadón Seco, Santa Cruz.
Brief description: Detailed engineering, supply, building, assembly and start up of: Valve and actuator change- MMCCs 1 to 5 -Lumbreras Compressing Plant, Salta.
Brief description: Engineering, material and labor supply, building and assembly of an 100 m3 LPG storage plant and its distribution network in Hipólito Irigoyen, Santa Cruz.
Brief description: Engineering, material and labor supply, building and assembly of an 100 m3 LPG storage plant and its distribution network in Tres Lagos, Santa Cruz.
Brief description: Basic and detailed engineering, material and equipment supply, building, assembly and commissioning for Tres Cerros Compressing Plant, in Salta. Note: This contract was interrupted by TGS S.A solely due to an investment plan reprogramming caused by the economic crisis in Argentina.