Finalizado Proyecto #179 5,2MM m3/day Expansion Detailed engineering, equipment and material supply, building, mounting and start up of high pressure gas pipe (Gasoducto Norte) Expansion 5,2MM m3/day, operated by TGN S.A. Total expansion 4 stages: 101,5 km gas pipe 30″ and 24″.
Finalizado Proyecto #178 Separation and dehydration plant – Aguada del Chañar Detailed engineering, equipment and material supply, building, mounting and start up of natural gas separation and dehydration plant and five flow-lines, located in Aguada del Chañar, 60km from Añelo, Neuquén.
Finalizado Proyecto #177 Turbo Compressor Plant Pichanal 2nd Manifold Basic and detailed engineering revision, supply, manufacturing, building and assembly, commissioning and assistance for Pichanal Turbo Compressor Plant Pichanal 2nd Manifold located in Salta.
Finalizado Proyecto #176 3.2MM m3 /day expansion Detailed engineering, material and equipment supply, building, assembly and commissioning in Córdoba for Gasoducto Norte, operated by TGN S.A . Total length 4 sections, 87.3km, 30″ and 24″ diameter.
Finalizado Proyecto #175 Turbo Compressor Plant San Jerónimo Basic and detailed engineering revision, supply, manufacturing, building and assembly, commissioning and assistance for San Jerónimo Turbo Compressor Plant -located in Santa Fe.